BIM vs “Hollywood BIM”

Clive Jordan
4 min readDec 12, 2018

--

Hollywood BIM can be mesmerizing but it needs to be backed up with some real BIM too :)

Original post: https://www.lodplanner.com/hollywood-bim

Isn’t there something mesmerizing about a spinning top?

The way it just keeps going around and around and around…

Unfortunately some teams also just spin a 3D model around and around on the screen — also just to mesmerize.

This is one part of “Hollywood BIM” (also a subset of Evil BIM 😉).

Just creating and spinning Hollywood BIM will not advance our AEC industry

Sadly we’ve seen the “Hollywood-BIM-effect” in full force during the design and construction bidding process…

THE “TRADITIONAL OWNER PITCH” USED TO BE:

  1. Here’s our brilliant design/construction team (that won’t be on your project!)
  2. Here are similar projects we have designed/constructed
  3. Hire Us?
Our best team — the team you will not get on your project ;)

BUT WITH BIM WE NOW SEE:

  1. Here’s our Hollywood BIM Movie Trailer (that will blow the “BIM budget”)
  2. Here’s our BIM guy
  3. When do we start?
Hollywood BIM Movie Trailer?

SAD THING IS …IT WORKED.

Oh no. What’s next?

As a result teams struggled to deliver on expectations usually without a clear plan of what had been sold.

Also at the same time the teams who were not awarded projects started to realize their “deficiency” and began commissioning and spinning their own models in front of owners.

Then it became a battle of the D’s:

OH, YOU ONLY DO “3D” — WELL, WE DO “4D”!

Yes, next up was the “4D BIM” movie…. you probably know how this one goes 😉

Now it’s time for our industry to get real.

EYE-CANDIE ALONE SHOULD NOT BE ENOUGH TO WIN CRITICAL DESIGN AND CONSTRUCTION PROJECTS — A DILIGENT PROJECT MANAGER

The good news is that we are starting to see a shift.

We are now seeing design and construction teams start to differentiate themselves from their competition by proving how they are able to better plan, manage and control BIM on projects for the benefit of the owner and also the project team themselves.

They are describing exactly which BIM Uses the team is planning, what BIM they need to get there, how they will achieve the benefits

….and how the owner’s life going to be better on this project as a result!

BIM Uses

These teams believe in planning the right BIM, at the right time, by the right people — for the right reasons — that’s what we call Smart Lean BIM.

Maybe you are ready to start your own SmartLeanBIM workflow?

Originally published at www.lodplanner.com

More BIM Blogs + Videos:

BIM Execution Planning Examples

[BLOG WITH VIDEO]: Here are some fantastic BEP insights from a contractor. In these two videos we hear about how they manage their BIM projects and what to include in a BIM Execution Plan (BEP). read more

[BLOG]: What is LOD 500? Here is a great blog explaining Level Of Development (LOD) — particularly LOD 500 — it’s a fun one 😅

read more

[BLOG]: We applied Lean concepts to BIM. Here is what we learned.

read more

[BLOG]: We mapped out the BIM Management workflow and found these “6 BIM Wastes” you should probably target to increase your BIM efficiencies…

read more

[BLOG]: Building Information Modeling (BIM) can sometimes be confusing — right? Have you ever “BIM” TLA’d to death? 😄 Last week a large contractor shared this BIM story…

read more

[BLOG]: Owners sometimes read online about the promise of BIM — but without the right plan and common goals things can quickly go wrong …

read more

[BLOG]: Building Information Modeling (BIM) explained in a way that your Grandma would understand…

read more

--

--

Clive Jordan
Clive Jordan

Written by Clive Jordan

Fighting “Evil BIM” @PlannerlyAEC

No responses yet